Current Projects

Current projects

SY Good Times – 33 meter – repair & maintenance - 2015

This beautiful Nordia van Dam has been docked for 2 years and now has a new owner. Jongkind Service Palma overhauls the Lugger main engine and the 16 and 33kW Northern Lights generators in Palma. We also update the hydraulics control and overhaul the pumps.

Fast patrol vessels - 11 meter – new built - 2015

For Madera Ribs (Veka Shipbuilding) we supply and install the complete technical installation excluding propulsion for 2 fast patrol and intervention vessels for an undisclosed navy. The propulsion is supplied by Haisma (Volvo).
 
Shipyard Madera Ribs (Veka Shipbuilding)
Installation Cornelis Jongkind Scheepinstallatietechniek
 

SY Hoek Design 126 - 38 meter – Claasen Shipyards new build - 2015

The largest Truly Classic built by Claasen Shipyards to date is this 126ft. For a returning client that is very happy with the technical installations (and off course the rest of his yacht) we are engineering and installing all technical systems. The yacht is equipped with among other things: two Northern Lights 32kW generators, a Scania main engine with a Westmekan controllable pitch system. Generators and main engine are equipped with hydraulic pumps that supply all hydraulic functions. The control and monitoring of a the systems  is done through the CJ developed A&M system.
Design Hoek Design
Hull Bloemsma Aluminiumbouw
Shpyard Claassen Shipyards
Installation Cornelis Jongkind Scheepinstallatietechniek
 

SY Kealoha in Palma de Mallorca – refit – 2015 - Palma

After she circumnavigated in 5 years the owner wants some of the systems updated and refitted in Palma. A new 20kW Northern Lights generator is installed, the exhaust system is renewed, hydraulic pipes are renewed and the energy system is updated.
Design Hoek Design Naval Architects
Hull F. Bloemsma Aluminiumbouw
Shipyard Claasen Jachtbouw, Zaandam
Installation Cornelis Jongkind Scheepsinstallatietechniek
 

SY Tamer II - 39 meter – refit – 2015

For Jongert Shipyard we are doing a major technical refit of most of energy and electrical system as well as piping systems. This includes: placing 2 new Northern Lights 55kW generators and new Webasto airconditioning compressors, renewing of much of the piping system, cabling and hydraulics; and installing an aerosol Lloyds approved fire extinguishing system in the engine room.